First one is out. Quite happy with it. Matte finish hides imperfections better, button press is easier, LED is daylight readable.
Casings manufacturer is redoing the LCD top block.
I'll be making them all day every day. I'll reply to my emails tonight but 90% of the replies are :
- Small has resumed and will ship every Monday and Thursday,
- LCD is at least 10 more days out due to the wrong casings.