Select to expand quote
olskool said..Hi Crew,
ive noticed the council reclaiming some beachfront near the moored catamaran ' Hitch hiker. So far theyve shored it all up n are placing a large boulder wall along the foreshore which has erroded dramatically over the last 12months.
Apparently this wall is to continue south along to the water pumping jetty near Gemini resort?
This could possibly RESTRICT our access to the waterway!!!



Leaving NO BEACH like further north towards Bills boat hire.

Id previously read council was to proceed building a rock wall from Military jetty to Bells ck. To possibly prevent erosion 'IF' Bribie Island washes through.
Anyone know whats going on? Any feedback?
Cheers Darkman
Is it all part of the Burke Street extension from what I see on the Council Website as below
Project scope
The
attached plan[2807KB] shows the layout for the construction of the new road.
The project will involve:provision of a two lane, asphalt road surface complete with cycle lanes in both East and West bound directions construction of two new roundabouts at Pelican Waters Blvd and Blaxland Street
major earthworks and drainage works through the road reserve area from the end of Burke Street through to Pelican Waters Blvd, providing the foundation for the new road surface
improving flood storage within the low-land road reserve by providing and re-sizing open drainage channels and storage basins
provision of road lighting and revegetation landscaping..
Looking at the drain pipes on Pelican Waters Bvd it has the wash back stop valves on them. See what happens in the next few months with the drainage channel going into GB directly.