Back to what this thread started being about.
Helmy's Nalu

Plan was to fit a foward windsurf centreboard fin..
Lockdown intervened, the Nalu went away to be paddled, today it returned.
Time to start work.
I had retained my router guides, centrelines were marked, box position decided on.
Bit conncerned we were going to find the handle when we routered out - should have had about 25mm clearance.

Measurements decided on, guide taped in place.
Still using the tape measure with feet and inches and metres on it - initial measurement of 4 ft. 6" marked at 196 cm or something.
Usual mistake of marking the back of the box position and preparing to use it as the cetreline.

Time to reember how to use the router.
And remember that to get 30mm depth, had to make 2 passes as the router bit wasn't long enough.

Had consulted the Gun Da Windy thread, cut the skin around the perimeter and in the box area.
Broken bit of DC still in use for router testing.


Widen out to leave a couple of "islands" to rest the router on.
Take to full depth.

Freehand the Islands away, use a sureform to get rid of the rest.

Neatened and cleaned up.

Measure and cut the divynicel interts.
Re cut to corrrect size.
Bit of fine tuning on the depth of the hole, still no sign of the handle.
Bit of trimming of the inserts.

Let Helmy decide how much glue to mix up.
Time to glue down.

Second mix of glue required.
Fitted in and weighted down.

Stage 1 complete in about 2 1/2 hours.
I think on the Gun Da Windy conversion, that was actually about stage 16 and 2 weeks work in.
More tomorrow......