Cut and made all the steering hoses and this morning loctited the fittings into the helm unit I've already fitted the steering hoses to the hydraulic pump and made the rest of the hoses to complete the steering circuit just need the loctite the rest of the fitting in position.
I have resealed the steering ram this week so it ready to install the hoses are made for it Ive three ball valves fitted coming off the hydraulic pump so it can be isolated if needed . Hoping the wind gen should power it ok in a storm sea.
She an over kill for a walker thats for sure
Two turns lock to lock
These photos were a few days ago so the return line from the pump is not in them
I fitted hull throughs into the floor to past my hose and cables and loom up to the pedestal .
I need to seal these up today and paint out a few spots . Next weekend I flush the system bleed it and attach P clamps to the hose circuit . The Hydraulic pump is mounted on the Mizzen bulkhead . So Id like to paint that area out as well.
Finish off the area around the cylinder mount and seal that up to mount my helm seat/ cylinder cover.
some time when the weather allows paint the non skid and revisit the where I painted the white surrounding the non skid
After painting last time the weather beat me next morning early so it need to be redone . hate that
Bought this off Kurt came off his compass H28 after obtaining 2950 RPM on the back of his repowered Kuboto 20 Hp
Hoping to gain a little more RPM out of it off the bukh DV 24 in my boat . my old one had a bad case of sea acme