Gumble said..
Just stumbled on the conversation. Currently looking to build on rural block with 11kv lines out front. Then have a 300m run to house. Current quotes to the house around 45k.
Was looking to have solar panels from start so their cost is neutral.
Are we at the stage with batteries that we could possibly invest that 45k into storage (batteries) stay off the grid and be viable ?
Cheers
Matt
Wow that's a nasty quote. Shop around mate. Should be about 1/3 that amount. I just finished a hybrid job with 100m of underground grid and it was $3500.
$45K just about gets you off grid with diesel gennie backup, but it depends on your house design. If it's a well designed house with small footprint and low energy consumption $45K could work. If it's a McMansion, forget it. You're going to have to outlay double that.
Who gave you the quote? The utility company? If so, you can arrange to sub-contract the trenching yourself. Trenching is where the money is made, not the wires. Wires are cheap. Downtime is small.
Also, is the 300m on or off property?