This whole thing may entirely not matter, and I suspect that's the case, but I'll ask away! I'm checking line lengths, and inconveniently my lines either end in loops or knots with no easy way to attach all 4 to a single point (unlike, for example, Ozone lines). I'm using small loops to attach to each line, then anchoring those.
For the knot ends I'm just attaching the loops like I would a kite.
For the loop ends (steering lines for me), I can either leave the loop fully open, or use the loop like I would on a kite, which shortens the lines a little.
This doesn't matter when checking steering line to steering line, or front line to front line. But how about checking steering line length vs front line length?
(I realise this is a small matter of adjusting the depower trim on the fly, but how do you do it? Does it even matter?)